The monthly technical luncheon from the ASCE Capital Branch for November 2020 featured a presentation from the Design Review Manager for the $1.47B Gerald Desmond Bridge Replacement Project in Long Beach, California. This bridge has recently opened to vehicular traffic which signifies a major milestone in this historic bridge project in the state of California.

The Gerald Desmond Bridge Replacement Project (GDBRP) at the Port of Long Beach in Long Beach, California contains many unique attributes:

By watching the replay you will learn:

ABOUT THE SPEAKER

Michael J. Borzok, PE, PMP

Michael Borzok, PE, PMP

Michael Borzok is an Assistant Vice President/Senior Engineering Manager for WSP USA.  He earned his Bachelor of Science degree in Civil Engineering from Lehigh University in 1994 and his Masters in Engineering Science from the Pennsylvania State University in 2005.  He has over 26 years of experience working on complex bridge projects and has been involved in the engineering investigation and rehabilitation of several long span bridges throughout his career including the San Francisco-Oakland Bay Bridge in California, the Ambassador Bridge in Detroit, Michigan, and the Benjamin Franklin Bridge in Philadelphia, Pennsylvania.  He is currently the Design Review Manager for the $1.47B Gerald Desmond Bridge Replacement Project in Long Beach, California which is the first vehicular cable-stayed bridge on the state’s highway system.  Michael is a registered Professional Engineer in California, Arizona, and Pennsylvania.